Leichhardt Town Hall Solar Rooftop System

Last Modified: Sun Mar 19 2017 08:34:06 GMT+0530 (India Standard Time)
  • 20 KW
    peak generation capacity of the solar rooftop system installed at the Leichhardt Town Hall located at 107 Norton Street, Leichhardt NSW 2040.
  • 29.3 MWh
    of electricity that can generated each year.
  • 32.3 tonnes
    reduction in CO2 emissions per year.
  • 103
    195W Schott Monocrystalline modules used. Project implementation by Solgen Energy.
  • 05 Jul 2012
    Date commissioned.
  • $?
    Project cost.
  • $?
    savings in electricity costs per year.
  • $?
    savings in electricity costs to date.
  • 83.93 tonnes
    reduction in CO2 emissions as on 19 Mar 2017.