Mornington Peninsula Shire: Efficient Streetlight upgrade project (proposed)

Last Modified: Wed Jan 25 2017 17:15:41 GMT+0530 (India Standard Time)
  • 12,525
    Number of inefficient street lights (80 W mercury vapour) that exist as of now.
  • 4,000 MWh
    estimated annual reduction in electricity consumption once all the lights are replaced.
  • <<savings in local currency>>
    savings due to reduction in consumption as well as maintenance costs over the 20-year lifespan of the lights.
  • 3,852 tonnes
    annual reduction in CO2 emissions.
  • <<project cost in local currency>>
    overall cost of the project.
  • <<number of years>> years
    estimated duration of the project.