SSNNL's canal top project in Vadodara,Gujarat

Last Modified: Sun Mar 12 2017 00:51:18 GMT+0530 (India Standard Time)
  • 10 MW
    installed capacity of the Sardar Sarovar Narmada Nigam Ltd (SSNNL) canal top project located in Waghodia, on the outskirts of Vadodara city.
  • 16,200 MWh
    of electricity will be generated each year.
  • ?
    approximate number of average Gujarat households that can be powered by the plant each year.
  • ? tonnes
    estimated reduction in GHG emissions once the plant is operational.
  • 3.6 km
    of irrigation canal along which the solar panels have been installed.
  • 33,800
    solar panels used.
  • 3
    organisations involved. Developer: SSNNL, EPC: Megha Engineering & Infrastructures Limited (MEIL), Central Funding Assistance: MNRE
  • Rs. 113 crore
    estimated cost of construction (EPC). MNRE will provide 30% as central funding assistance.
  • Apr 2017
    Planned date of commissioning. Work for transmission line is in progress, all other construction activities completed.