List of airports in India with solar plants commissioned, are under construction or being planned

Last Modified: Wed May 27 2020 19:32:04 GMT+0530 (India Standard Time)
  • 38
    Number of airports in India where rooftop solar and/or ground mounted solar systems have either been commissioned, are under construction or being planned.
  • 124.5 MWp
    peak installed capacity of all projects combined.
  • 77.6 MW
    Capacity commissioned to date.
  • 46.8 MWp
    Capacity under construction, tendered or being planned.
  • 750 KW
    Calicut International Airport. (Click/Tap for details).
  • 5 MW
    Chandigarh Airport. 200 kWp rooftop solar PV system operational. Ground mounted, grid connected system with total capacity of 5 MWp (3 MWp in Phase I and 2 MWp in Phase II) with 3 MWp commissioned.
  • 1.5 MW
    Chennai Airport. Rooftop solar PV system operational since Aug 2016.
  • 40 MWp
    Cochin International Airport. (Click/Tap here for details).
  • 5 MW
    Hyderabad International Airport Ltd
  • 1.9 MW
    Jaipur Airport. 100 kWp rooftop solar and 1.8 MW ground mounted, grid connected systems operational since Feb 2018.
  • 2 MW
    Netaji Subhash Chandra Bose International Airport Kolkata. (Click/Tap here for details).
  • 515 kWp
    Chaudhary Charan Singh Airport, Lucknow. 2 systems 500 kWp and 15 kWp, tenders issued by AAI.
  • 7.84 MW
    Delhi International Airport Limited, New Delhi
  • 250 KW
    Ranchi Airport
  • 1 MWp
    Vijaywada Airport. Ground mounted solar PV system operational since Aug 2019. (Click/Tap for project details).
  • 140 kWp
    Tiruchirapalli (Trichy) International Airport. Ground mounted solar PV system operational since Apr 2019.
  • 8 MW
    Hubballi Airport. Proposed ground mounted system, tender floated by AAI in Nov 2018.
  • 1 MW
    Renigunta International Airport, Tirupati. Ground mounted solar PV system operational since May 2018.
  • 4 MW
    Biju Patnaik International (BPI) Airport, Bhubaneshwar. Proposed ground mounted, grid connected system, tender floated by AAI in Jan 2019.
  • 300 kWp
    Prayagraj Airport, Uttar Pradesh. Proposed ground mounted, grid connected system, tender floated by AAI in May 2019.
  • 1 MW
    Begumpet Airport, Hyderabad. Proposed ground mounted system, tender floated by AAI in Nov 2018.
  • 5 MW
    Calicut Airport. Proposed ground mounted system, tender floated by AAI in Feb 2019.
  • 4 MW
    Tiruchirapalli (Trichy) International Airport. Proposed ground mounted system, tender floated by AAI for preparation of detailed project report (DPR) in Jan 2019. 1 MW commissioned in Apr 2019.
  • 1.2 MW
    Lal Bahadur Shastri International Airport (LBSI) in Varanasi, Uttar Pradesh. Proposed ground mounted, grid connected solar PV systems, tender issued by AAI in Apr 2018.
  • 15 MW
    Netaji Subhash Chandra Bose International Airport Kolkata. Ground mounted, grid connected system operational since Dec 2017.
  • 700 kWp
    Ahmedabad Airport. Rooftop solar system operational since Mar 2018.
  • 900 kWp
    Madurai Airport. Rooftop solar PV project with 730 kWp capacity built in phase 2 and operational since Jul 2019.
  • 1 MW
    Raja Bhoj Airport, Bhopal. Ground mounted, grid connected system operational since Mar 2019.
  • 540 kWp
    Lokpriya Gopinath Bordoloi International Airport (LGBI), Guwahati. Proposed rooftop solar system.
  • 100 kWp
    Lohegaon Airport, Pune. Proposed grid-connected flexible solar PV power plant system with AAI having floated tender Oct 2019.
  • 725 kWp
    Dibrugarh Airport, Assam. System operational since late 2019.
  • 220 kWp
    Gaya Airport, Bihar. System operational since late 2019.
  • 220 kWp
    Birsi Airport, Gondia, Maharashtra. System operational since late 2019.
  • 400 kWp
    Sri Guru Ram Das Jee International Airport, Amritsar. Project under construction.
  • 675 kWp
    Vadodara Airport. Ground mounted, grid connected system operational since Jul 2018.
  • 3.35 MW
    Kempegowda International Airport, Bengaluru. Plant spread over 8 rooftops is operational since Feb 2019.
  • 500 kWp
    Thiruvananthapuram Airport. Proposed rooftop solar PV system with AAI having floated SITC in Dec 2018.
  • 150 kWp
    Rajkot Airport. Proposed rooftop solar PV power plant system with AAI having floated tender in Aug 2017.
  • 1.5 MW
    Swami Vivekananda Airport, Raipur. Proposed grid-connected flexible solar PV power plant system with AAI having floated tender in Mar 2020.
  • 1 MW
    Devi Ahilyabai Holkar Airport, Indore. Ground mounted, grid connected system operational since Aug 2018.
  • 219 kWp
    Patna Airport. Operational.
  • 6.5 MWp
    Chennai Airport. AAI awarded contract in May 2019 and construction underway.
  • 50 kWp
    Bagdogra Airport. Rooftop solar Pv system operational since Feb 2017.
  • 100 kWp
    Jodhpur Airport. Rooftop solar PV system operational since Oct 2018.
  • 158 kWp
    Veer Savarkar International Airport, Port Blair. Rooftop solar PV system operational since Jun 2017.
  • 100 kWp
    Jaisalmer Airport.