Dalby Solar Farm, Queensland, Australia

Last Modified: Mon Dec 04 2017 05:24:02 GMT+0530 (India Standard Time)
  • 30 MW
    planned installed capacity of the proposed solar farm to be built near the town of Dalby, at a site located at the intersection of Blaxland–South Rd and the Warrego Highway.
  • ? MWh
    proposed to be generated per year.
  • ?
    approximate number of households that can be powered by the farm.
  • ? tonnes
    estimated reduction in CO2 emissions each year, once the farm is operational.
  • 82
    hectares of land will be used for the farm.
  • ?
    solar panels will be used on mounting structures across the site.
  • 3
    major organisations involved: 1) Project owner and developer: FRV 2) EPC and O&M: TBD 3) Distribution: TBD.
  • ? million
    estimated project cost.
  • 90
    peak jobs during construction phase.
  • ?
    FTE during operational phase.
  • Jul 2017
    Expected commencement of project. Project will take approximately one year to construct.
  • 21 Jul 2016
    Development approval obtained from Western Downs Regional Council.