Rooftop Solar at Christ Church Grammar School, Perth, Western Australia

Last Modified: Thu Dec 21 2017 16:08:42 GMT+0530 (India Standard Time)
  • 670 kW
    installed capacity of planned rooftop solar system at Claremont campus of Christ Church Grammar School in Perth.
  • ? kWh
    Electricity will be generated each year from the system.
  • ?
    Percentage of current electric consumption that will be offset by the solar system.
  • ?
    solar panels used.
  • ?
    Project cost.
  • $200,000
    annual savings in electricity costs as a result of the installation.
  • ? years
    Return on Investment.
  • ? tonnes
    Reduction in CO2 equivalent emissions over a 20 year lifetime of the project.
  • 1Q2018
    Planned start of construction. Perdaman Advanced Energy has been selected to install the system.