114.75 tmc
Linganamakki Dam. At 75% of its live capacity of 151.75 tmc. On 28 Jul, levels filled to 75% of capacity and crossed 1,800 feet level - the first time in last 3 years that this has happened in the month of July. Considered the lifeline of hydro power in the state, the reservoir provides water to the Sharavathi generating station, having an installed capacity of 1,035 MW.
100.49 tmc
Supa Dam. At 69% of its live capacity of 145.33 tmc. Was 88.76 tmc at the end of Oct.
20.73 tmc
Varahi Dam. At 67% of its live capacity of 31.10 tmc. Was 18.69 tmc at the end of Oct.

7.55 tmc
Harangi Dam. At 94% of its live capacity of 8.07 tmc. As the levels started to reach near maximum levels, the 4 crest gates of the dam in Somwarpet taluk of Kodagu were opened on 07 Jul releasing water to KRS Dam. The dam irrigates over 1.5 lakh hectares of land in Periyapatna, Hunsur, K.R. Nagar and Arakalagud in Hassan.

33.90 tmc
Hemavathi Dam. At 93% of its live capacity of 35.76 tmc. The 6 gates of the reservoir in Gorur of Hassan district were opened in the afternoon of 14 Jul as the water level reached the brim (2,922 ft).
42.71 tmc
Krishna Raja Sagara Dam. At 95% of its live capacity of 45.05 tmc. For the first time in 38 years KRS dam is almost full in July! (- @MysuruMemes)
15.02 tmc
Kabini Dam. At 96% of its live capacity of 15.67 tmc. First overflowed this year on 21 Jul.
61.31 tmc
Bhadra Dam. At 97% of its live capacity of 63.04 tmc. Was 46.64 tmc at the end of Oct.
94.13 tmc
Tungabhadra Dam. At 94% of its live capacity of 100.86 tmc. Tungabhadra reservoir is an inter-state project catering to the drinking water and irrigation needs of six districts — Ballari, Koppal and Raichur in Karnataka and Anantapur, Kadapa and Kurnool districts in Andhra Pradesh. In addition to the canals, farmers along the bank of the river downstream of the reservoir, depend on the river for drinking water and for irrigation.
45.06 tmc
Ghataprabha Dam. At 92% of its live capacity of 48.98 tmc. Was 44.31 tmc at the end of Oct.
15.32 tmc
Malaprabha Dam. At 45% of its live capacity of 34.35 tmc. Was 14.25 tmc at the end of Oct.
116.59 tmc
Almatti Dam. At 98% of its live capacity of 119.26 tmc. Was 119.26 tmc at the end of Oct.

24.20 tmc
Narayanapura Dam. At 93% of its live capacity of 27 tmc. Was 24.88 tmc at the end of Oct.