Hydroelectric Project operated by North Eastern Electric Power Corporation Limited

Last Modified: Sat Aug 04 2018 19:23:13 GMT+0530 (India Standard Time)
  • 450 MW
    Ranganadi Hydroelectric Project located in the Lower Subansiri district of Arunachal Pradesh. 3 units of 135 MW capacity each operational.
  • 75 MW
    Doyang Hydroelectric Project located in the Wokha district of Nagaland. 3 units of 25 MW capacity each operational.
  • 110 MW
    Pare Hydroelectric Project located in the Papum Pare district of Arunachal Pradesh. 2 units of 55 MW capacity each operational.
  • 60 MW
    Tuirial Hydroelectric Project located in the Kolasib district of Mizoram. 2 units of 30 MW capacity each operational.
  • 275 MW
    Kopili Hydroelectric Project located in the Dima Hasao district of Assam. Unit 1 - 200 MW, Unit 2 - 50 MW, Unit 3 - 25 MW - all operational.
  • 600 MW
    Kameng Hydroelectric Project located in the West Kameng district of Arunachal Pradesh. 4 units of 150 MW capacity each - on going.