List of solar energy projects that are being built by TANGEDCO

Last Modified: Thu Mar 05 2020 21:20:14 GMT+0530 (India Standard Time)
  • 2,000 MW
    Total capacity sought to be developed by The Tamil Nadu Generation and Distribution Corporation (TANGEDCO).
  • 709 MW
    NLC India. Awarded in Sep 2017. Tariff INR 3.47 per kWh. In Sep 2019, NLC announced it had commissioned all of the awarded capacity.
  • 100 MW
    Raasi Green Energy. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 100 MW
    Solitaire BTN Solar (HPPPL). Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 100 MW
    Narbheram Visharam (Atha Group). Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 100 MW
    Rays Power Infra. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 100 MW
    NVR Energy (Atha Group). Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 100 MW
    ReNew Solar. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 54 MW
    Sai Jyothi Infrastructure Ventures. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 50 MW
    Solar Arise. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 50 MW
    Shapporji Pallonji Infra. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 30 MW
    GRT - 3 x 10 MW. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 5 MW
    Dynamize Solar. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 1 MW
    Sunlight. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 1 MW
    Dev International. Awarded in Sep 2017. Tariff INR 3.47 per kWh.
  • 500 MW
    TANGEDCO. Ramnathpuram Solar Park.