    Projects involving interception & diversion works (I&D works). The proposed drains for I&D works include:
  • #1
    Interception and Diversion of drains work at Nala Sapera Basti at a proposed cost of Rs. 37 lakhs.
  • #2
    Interception and Diversion of drains work at Nala near Rajiv Gandhi International Stadium bridge at a proposed cost of Rs. 109.35 lakhs.
  • #3
    Interception and Diversion of drains work at Nala Shyampur near Polytechnic at a proposed cost of Rs. 65.51 lakhs.
  • Rs. 211.86 lakhs
    Estimated cost of the 3 I&D works.
  • 3
    Number of Sewage Treatment Plants proposed to be constructed. These include:
  • #1
    STP at Nala Saperabasti with treatment capacity of 1.5 MLD at a proposed cost of Rs. 608.80 lakhs.
  • #2
    STP at Nala near Rajiv Gandhi International Stadium bridge with treatment capacity of 1.0 MLD at a proposed cost of Rs. 494.40 lakhs.
  • #3
    STP at Nala Shyampur near Polytechnic with treatment capacity of 5.0 MLD at a proposed cost of Rs. 1,062.80 lakhs.
  • Rs. 2,166 lakhs
    Estimated cost of setting up the 3 STPs.
  • Rs. 5815.16 lakhs
    Estimated costs for Operations and Maintenance for 15 years, land acquisition and other costs.