List of operational, under construction and planned solar farms in Cambodia

Last Modified: Thu Mar 04 2021 06:37:59 GMT+0530 (India Standard Time)
  • 210 MW
    Combined generation capacity of operational farms.
  • 110 MW
    Combined generation capacity of farms under construction.
  • 200 MW
    Combined generation capacity of solar farm investment projects approved by the government.
  • 10 MW
    Generation of Bavet Solar Farm located in Svay Rieng province. The project is operational and developed by Singapore’s Sunseap.
  • 80 MW
    Generation capacity of solar farm in Kampong Speu province. The project is operational and developed by SchneiTec Renewable Co Ltd, a joint venture between Chinese and local partners.
  • 60 MW
    Generation capacity of the solar farm located in Taing Krasaing commune’s Romeas village in Teuk Phos district. The farm was connected to the national grid in Apr 2020. The project is developed by SchneiTec Renewable Co Ltd, a joint venture between Chinese and local partners.
  • 30 MW
    Planned generation capacity of solar farm in Pursat province which is currently under construction. The project is being developed by SchneiTec Renewable.
  • 20 MW
    Planned generation capacity of solar farm in Svay Reign province which is under construction.
  • 60 MW
    Planned generation capacity of solar farm in Battambang province which is under construction.
  • 30 MW
    Planned generation capacity of solar farm located in Serei Saophoan, Banteay Meanchey Province. The project entered commercial operation on 15 Dec 2020. The project is owned by Ray Power Supply Co., Ltd, a company fully owned by B. Grimm Power Public Company Limited, Thailand.
  • 60 MW
    Planned generation capacity of solar farm in Kampong Chhnang province’s southwestern district of Teuk Phos. The project will be jointly owned Canadian-Cambodian project developer Schnei Tec Renewable Co. Ltd. as per a 20-year build-own-model. Japanese-led Asian Development Bank (ADB) approved a $16.4 million loan in Feb 2021
  • 80 MW
    Planned generation capacity of the Stung Pursat I solar farm that will be developed by Cambodia energy services provider SPHP at an estimated cost of US$58 million. The farm is located in Pramoy commune under a 39-year, build-operate-transfer model.
  • 60 MW
    Planned generation capacity of a solar farm to be built in Pursat Province’s Krakor district. The project will be jointly owned Canadian-Cambodian project developer Schnei Tec Renewable Co. Ltd. as per a 20-year build-own-model.
  • 30 MW
    Generation capacity of a solar farm in Pursat Province’s Krakor district. The project is jointly owned Canadian-Cambodian project developer Schnei Tec Renewable Co. Ltd. as per a 20-year build-own-model. KeoRottanak, director-general of State-run electricity supplier Electricite du Cambodge (EdC), was quoted by local media as saying on 22 Sep 2020 that the plant had been commissioned by the EdC to be connected to the national grid in SnaAnsa commune.