India: Thermal Power Stations with coal stocks in critical or super critical state as on 30 Apr 2022

Last Modified: Mon May 02 2022 00:45:19 GMT+0530 (India Standard Time)
  • 12
    Number of coal powered plants in India with 0 day of coal stock available for operation. Combined generation capacity of these plants is 8,355 MW
  • 16
    Number of coal powered plants in India with 1 day of coal stock available for operation. Combined generation capacity of these plants is 19,720 MW
  • 19
    Number of coal powered plants in India with 2 days of coal stock available for operation. Combined generation capacity of these plants is 21,890 MW
  • 17
    Number of coal powered plants in India with 3 days of coal stock available for operation. Combined generation capacity of these plants is 21,254 MW
  • 16
    Number of coal powered plants in India with 4 days of coal stock available for operation. Combined generation capacity of these plants is 24,955 MW
  • 12
    Number of coal powered plants in India with 5 days of coal stock available for operation. Combined generation capacity of these plants is 11,442 MW
  • 12
    Number of coal powered plants in India with 6 days of coal stock available for operation. Combined generation capacity of these plants is 18,800 MW
  • 9
    Number of coal powered plants in India with 7 days of coal stock available for operation. Combined generation capacity of these plants is 11,010 MW
  • 3
    Number of coal powered plants in India with 8 days of coal stock available for operation. Combined generation capacity of these plants is 2,710 MW
  • 116
    Number of coal powered plants in India where coal stock is in critical or super critical state. Combined generation capacity of these plants is 140,136 MW
  • 41,110 tonnes
    Actual coal stock at the 710 MW PANIPAT TPS equivalent to 4 days of rolling stock, against the normative stock of 268,375 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 228,510 tonnes
    Actual coal stock at the 1,200 MW RAJIV GANDHI TPS equivalent to 13 days of rolling stock, against the normative stock of 467,802 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 47,940 tonnes
    Actual coal stock at the 600 MW YAMUNA NAGAR TPS equivalent to 5 days of rolling stock, against the normative stock of 230,238 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 49,880 tonnes
    Actual coal stock at the 920 MW GH TPS (LEH.MOH.) equivalent to 4 days of rolling stock, against the normative stock of 332,682 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 108,250 tonnes
    Actual coal stock at the 840 MW ROPAR TPS equivalent to 9 days of rolling stock, against the normative stock of 301,848 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 15,150 tonnes
    Actual coal stock at the 500 MW CHHABRA-I PH-1 TPP equivalent to 3 days of rolling stock, against the normative stock of 133,168 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 102,190 tonnes
    Actual coal stock at the 1,240 MW KOTA TPS equivalent to 6 days of rolling stock, against the normative stock of 465,893 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 67,560 tonnes
    Actual coal stock at the 1,500 MW SURATGARH TPS equivalent to 5 days of rolling stock, against the normative stock of 388,668 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 35,020 tonnes
    Actual coal stock at the 1,200 MW KALISINDH TPS equivalent to 2 days of rolling stock, against the normative stock of 397,409 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 46,290 tonnes
    Actual coal stock at the 1,320 MW SURATGARH STPS equivalent to 3 days of rolling stock, against the normative stock of 434,079 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 33,190 tonnes
    Actual coal stock at the 500 MW CHHABRA-I PH-2 TPP equivalent to 5 days of rolling stock, against the normative stock of 164,424 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 40,660 tonnes
    Actual coal stock at the 1,320 MW CHHABRA-II TPP equivalent to 2 days of rolling stock, against the normative stock of 434,079 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 199,510 tonnes
    Actual coal stock at the 2,630 MW ANPARA TPS equivalent to 6 days of rolling stock, against the normative stock of 596,210 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 68,650 tonnes
    Actual coal stock at the 1,265 MW HARDUAGANJ TPS equivalent to 4 days of rolling stock, against the normative stock of 497,029 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 58,740 tonnes
    Actual coal stock at the 1,094 MW OBRA TPS equivalent to 3 days of rolling stock, against the normative stock of 445,767 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 17,380 tonnes
    Actual coal stock at the 1,140 MW PARICHHA TPS equivalent to 1 days of rolling stock, against the normative stock of 430,840 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 59,520 tonnes
    Actual coal stock at the 500 MW DSPM TPS equivalent to 8 days of rolling stock, against the normative stock of 183,408 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 228,670 tonnes
    Actual coal stock at the 1,340 MW KORBA-WEST TPS equivalent to 11 days of rolling stock, against the normative stock of 362,431 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 187,190 tonnes
    Actual coal stock at the 1,000 MW MARWA TPS equivalent to 12 days of rolling stock, against the normative stock of 398,235 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 99,020 tonnes
    Actual coal stock at the 630 MW GANDHI NAGAR TPS equivalent to 11 days of rolling stock, against the normative stock of 229,606 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 45,750 tonnes
    Actual coal stock at the 1,110 MW UKAI TPS equivalent to 3 days of rolling stock, against the normative stock of 395,616 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 151,240 tonnes
    Actual coal stock at the 2,270 MW WANAKBORI TPS equivalent to 5 days of rolling stock, against the normative stock of 812,323 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 47,450 tonnes
    Actual coal stock at the 210 MW AMARKANTAK EXT TPS equivalent to 17 days of rolling stock, against the normative stock of 47,279 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 28,870 tonnes
    Actual coal stock at the 1,340 MW SANJAY GANDHI TPS equivalent to 1 days of rolling stock, against the normative stock of 585,557 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 54,960 tonnes
    Actual coal stock at the 1,330 MW SATPURA TPS equivalent to 3 days of rolling stock, against the normative stock of 473,626 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 129,220 tonnes
    Actual coal stock at the 2,520 MW SHREE SINGAJI TPP equivalent to 4 days of rolling stock, against the normative stock of 944,178 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 29,010 tonnes
    Actual coal stock at the 1,210 MW BHUSAWAL TPS equivalent to 2 days of rolling stock, against the normative stock of 459,816 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 278,810 tonnes
    Actual coal stock at the 2,920 MW CHANDRAPUR(MAHARASHTRA) STPS equivalent to 6 days of rolling stock, against the normative stock of 1,212,156 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 122,380 tonnes
    Actual coal stock at the 1,340 MW KHAPARKHEDA TPS equivalent to 5 days of rolling stock, against the normative stock of 631,590 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 58,950 tonnes
    Actual coal stock at the 2,190 MW KORADI TPS equivalent to 2 days of rolling stock, against the normative stock of 887,028 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 15,370 tonnes
    Actual coal stock at the 630 MW NASIK TPS equivalent to 1 days of rolling stock, against the normative stock of 269,839 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 15,010 tonnes
    Actual coal stock at the 500 MW PARAS TPS equivalent to 2 days of rolling stock, against the normative stock of 196,981 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 67,170 tonnes
    Actual coal stock at the 750 MW PARLI TPS equivalent to 7 days of rolling stock, against the normative stock of 267,384 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 134,680 tonnes
    Actual coal stock at the 1,600 MW DAMODARAM SANJEEVAIAH TPS equivalent to 6 days of rolling stock, against the normative stock of 556,394 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 31,650 tonnes
    Actual coal stock at the 1,760 MW Dr. N.TATA RAO TPS equivalent to 1 days of rolling stock, against the normative stock of 719,094 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 24,990 tonnes
    Actual coal stock at the 1,650 MW RAYALASEEMA TPS equivalent to 1 days of rolling stock, against the normative stock of 666,957 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 60,740 tonnes
    Actual coal stock at the 1,700 MW BELLARY TPS equivalent to 3 days of rolling stock, against the normative stock of 571,952 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 130,190 tonnes
    Actual coal stock at the 1,720 MW RAICHUR TPS equivalent to 6 days of rolling stock, against the normative stock of 601,997 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 32,310 tonnes
    Actual coal stock at the 1,600 MW YERMARUS TPP equivalent to 2 days of rolling stock, against the normative stock of 525,829 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 35,940 tonnes
    Actual coal stock at the 840 MW METTUR TPS equivalent to 3 days of rolling stock, against the normative stock of 360,653 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 18,660 tonnes
    Actual coal stock at the 600 MW METTUR TPS - II equivalent to 2 days of rolling stock, against the normative stock of 247,537 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 52,050 tonnes
    Actual coal stock at the 1,830 MW NORTH CHENNAI TPS equivalent to 2 days of rolling stock, against the normative stock of 794,913 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 21,180 tonnes
    Actual coal stock at the 1,050 MW TUTICORIN TPS equivalent to 1 days of rolling stock, against the normative stock of 535,005 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 79,580 tonnes
    Actual coal stock at the 1,080 MW BHADRADRI TPP equivalent to 5 days of rolling stock, against the normative stock of 395,059 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 140,690 tonnes
    Actual coal stock at the 1,100 MW KAKATIYA TPS equivalent to 11 days of rolling stock, against the normative stock of 218,902 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 113,960 tonnes
    Actual coal stock at the 1,000 MW KOTHAGUDEM TPS (NEW) equivalent to 9 days of rolling stock, against the normative stock of 339,831 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 51,480 tonnes
    Actual coal stock at the 800 MW KOTHAGUDEM TPS (STAGE-7) equivalent to 6 days of rolling stock, against the normative stock of 210,111 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 15,400 tonnes
    Actual coal stock at the 63 MW RAMAGUNDEM-B TPS equivalent to 16 days of rolling stock, against the normative stock of 16,733 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 104,050 tonnes
    Actual coal stock at the 1,200 MW SINGARENI TPP equivalent to 7 days of rolling stock, against the normative stock of 366,562 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 14,240 tonnes
    Actual coal stock at the 420 MW TENUGHAT TPS equivalent to 2 days of rolling stock, against the normative stock of 166,988 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 380,170 tonnes
    Actual coal stock at the 1,740 MW IB VALLEY TPS equivalent to 13 days of rolling stock, against the normative stock of 503,468 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 12,040 tonnes
    Actual coal stock at the 1,050 MW BAKRESWAR TPS equivalent to 1 days of rolling stock, against the normative stock of 345,817 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 230 tonnes
    Actual coal stock at the 270 MW BANDEL TPS equivalent to 0 days of rolling stock, against the normative stock of 111,357 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 8,320 tonnes
    Actual coal stock at the 550 MW D.P.L. TPS equivalent to 1 days of rolling stock, against the normative stock of 196,926 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 30 tonnes
    Actual coal stock at the 840 MW KOLAGHAT TPS equivalent to 0 days of rolling stock, against the normative stock of 334,700 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 48,850 tonnes
    Actual coal stock at the 1,600 MW SAGARDIGHI TPS equivalent to 2 days of rolling stock, against the normative stock of 519,643 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 12,390 tonnes
    Actual coal stock at the 500 MW SANTALDIH TPS equivalent to 2 days of rolling stock, against the normative stock of 186,247 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 15,930 tonnes
    Actual coal stock at the 1,820 MW DADRI (NCTPP) equivalent to 1 days of rolling stock, against the normative stock of 650,919 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 1,152,850 tonnes
    Actual coal stock at the 3,000 MW RIHAND STPS equivalent to 30 days of rolling stock, against the normative stock of 664,183 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 544,720 tonnes
    Actual coal stock at the 2,000 MW SINGRAULI STPS equivalent to 20 days of rolling stock, against the normative stock of 458,349 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 44,310 tonnes
    Actual coal stock at the 1,760 MW TANDA TPS equivalent to 2 days of rolling stock, against the normative stock of 648,473 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 92,250 tonnes
    Actual coal stock at the 1,550 MW UNCHAHAR TPS equivalent to 4 days of rolling stock, against the normative stock of 548,517 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 556,700 tonnes
    Actual coal stock at the 2,600 MW KORBA STPS equivalent to 16 days of rolling stock, against the normative stock of 602,721 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 386,430 tonnes
    Actual coal stock at the 1,600 MW LARA TPP equivalent to 18 days of rolling stock, against the normative stock of 559,144 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 567,280 tonnes
    Actual coal stock at the 2,980 MW SIPAT STPS equivalent to 14 days of rolling stock, against the normative stock of 699,389 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 77,760 tonnes
    Actual coal stock at the 1,600 MW GADARWARA TPP equivalent to 4 days of rolling stock, against the normative stock of 559,560 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 162,720 tonnes
    Actual coal stock at the 1,320 MW KHARGONE STPP equivalent to 10 days of rolling stock, against the normative stock of 419,879 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 1,635,240 tonnes
    Actual coal stock at the 4,760 MW VINDHYACHAL STPS equivalent to 24 days of rolling stock, against the normative stock of 1,145,562 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 49,140 tonnes
    Actual coal stock at the 2,320 MW MAUDA TPS equivalent to 1 days of rolling stock, against the normative stock of 855,636 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 43,820 tonnes
    Actual coal stock at the 1,320 MW SOLAPUR STPS equivalent to 3 days of rolling stock, against the normative stock of 391,057 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 198,400 tonnes
    Actual coal stock at the 2,000 MW SIMHADRI equivalent to 6 days of rolling stock, against the normative stock of 825,378 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 68,840 tonnes
    Actual coal stock at the 2,400 MW KUDGI STPP equivalent to 2 days of rolling stock, against the normative stock of 799,569 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 130,820 tonnes
    Actual coal stock at the 2,600 MW RAMAGUNDEM STPS equivalent to 4 days of rolling stock, against the normative stock of 560,347 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 68,750 tonnes
    Actual coal stock at the 710 MW BARAUNI TPS equivalent to 8 days of rolling stock, against the normative stock of 237,151 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 97,930 tonnes
    Actual coal stock at the 660 MW BARH I equivalent to 11 days of rolling stock, against the normative stock of 234,543 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 195,860 tonnes
    Actual coal stock at the 1,320 MW BARH II equivalent to 11 days of rolling stock, against the normative stock of 469,086 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 137,550 tonnes
    Actual coal stock at the 2,340 MW KAHALGAON TPS equivalent to 4 days of rolling stock, against the normative stock of 646,821 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 399,590 tonnes
    Actual coal stock at the 1,600 MW DARLIPALI STPS equivalent to 17 days of rolling stock, against the normative stock of 392,857 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 759,000 tonnes
    Actual coal stock at the 3,000 MW TALCHER STPS equivalent to 16 days of rolling stock, against the normative stock of 825,631 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 174,430 tonnes
    Actual coal stock at the 2,100 MW FARAKKA STPS equivalent to 6 days of rolling stock, against the normative stock of 508,001 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 42,900 tonnes
    Actual coal stock at the 750 MW BONGAIGAON TPP equivalent to 5 days of rolling stock, against the normative stock of 232,532 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 162,580 tonnes
    Actual coal stock at the 1,500 MW INDIRA GANDHI STPP equivalent to 8 days of rolling stock, against the normative stock of 530,110 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 308,230 tonnes
    Actual coal stock at the 1,320 MW MEJA STPP equivalent to 17 days of rolling stock, against the normative stock of 472,538 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 119,660 tonnes
    Actual coal stock at the 500 MW BHILAI TPS equivalent to 15 days of rolling stock, against the normative stock of 201,287 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 158,180 tonnes
    Actual coal stock at the 1,500 MW VALLUR TPP equivalent to 7 days of rolling stock, against the normative stock of 573,056 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 86,020 tonnes
    Actual coal stock at the 390 MW MUZAFFARPUR TPS equivalent to 14 days of rolling stock, against the normative stock of 158,867 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 221,520 tonnes
    Actual coal stock at the 1,980 MW NABINAGAR STPP equivalent to 9 days of rolling stock, against the normative stock of 611,146 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 78,810 tonnes
    Actual coal stock at the 1,000 MW NABINAGAR TPP equivalent to 6 days of rolling stock, against the normative stock of 364,214 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 168,960 tonnes
    Actual coal stock at the 500 MW BOKARO TPS `A` EXP equivalent to 29 days of rolling stock, against the normative stock of 151,703 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 134,370 tonnes
    Actual coal stock at the 500 MW CHANDRAPURA(DVC) TPS equivalent to 21 days of rolling stock, against the normative stock of 163,079 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 134,720 tonnes
    Actual coal stock at the 1,000 MW KODARMA TPP equivalent to 11 days of rolling stock, against the normative stock of 330,632 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 140,520 tonnes
    Actual coal stock at the 1,000 MW DURGAPUR STEEL TPS equivalent to 10 days of rolling stock, against the normative stock of 368,050 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 27,040 tonnes
    Actual coal stock at the 210 MW DURGAPUR TPS equivalent to 6 days of rolling stock, against the normative stock of 117,705 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 238,570 tonnes
    Actual coal stock at the 2,340 MW MEJIA TPS equivalent to 7 days of rolling stock, against the normative stock of 848,487 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 338,220 tonnes
    Actual coal stock at the 1,200 MW RAGHUNATHPUR TPP equivalent to 22 days of rolling stock, against the normative stock of 408,055 tonnes, equivalent to 26 days of normative stock required at the plant.
  • tonnes
    Actual coal stock at the 1,000 MW NTPL TUTICORIN TPP equivalent to 0 days of rolling stock, against the normative stock of 346,862 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 343,190 tonnes
    Actual coal stock at the 1,320 MW MAHATMA GANDHI TPS equivalent to 21 days of rolling stock, against the normative stock of 427,058 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 33,060 tonnes
    Actual coal stock at the 540 MW GOINDWAL SAHIB TPP equivalent to 4 days of rolling stock, against the normative stock of 202,598 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 337,370 tonnes
    Actual coal stock at the 1,400 MW RAJPURA TPP equivalent to 22 days of rolling stock, against the normative stock of 407,536 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 195,640 tonnes
    Actual coal stock at the 1,980 MW TALWANDI SABO TPP equivalent to 7 days of rolling stock, against the normative stock of 694,670 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 20,790 tonnes
    Actual coal stock at the 1,320 MW KAWAI TPS equivalent to 1 days of rolling stock, against the normative stock of 417,668 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 54,940 tonnes
    Actual coal stock at the 1,200 MW ANPARA C TPS equivalent to 4 days of rolling stock, against the normative stock of 266,559 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 2,810 tonnes
    Actual coal stock at the 90 MW BARKHERA TPS equivalent to 2 days of rolling stock, against the normative stock of 38,237 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 370 tonnes
    Actual coal stock at the 90 MW KHAMBARKHERA TPS equivalent to 0 days of rolling stock, against the normative stock of 38,223 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 3,960 tonnes
    Actual coal stock at the 90 MW KUNDARKI TPS equivalent to 3 days of rolling stock, against the normative stock of 36,320 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 16,650 tonnes
    Actual coal stock at the 1,980 MW LALITPUR TPS equivalent to 1 days of rolling stock, against the normative stock of 642,563 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 1,230 tonnes
    Actual coal stock at the 90 MW MAQSOODPUR TPS equivalent to 1 days of rolling stock, against the normative stock of 37,728 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 162,530 tonnes
    Actual coal stock at the 1,980 MW PRAYAGRAJ TPP equivalent to 6 days of rolling stock, against the normative stock of 656,450 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 3,040 tonnes
    Actual coal stock at the 1,200 MW ROSA TPP Ph-I equivalent to 0 days of rolling stock, against the normative stock of 417,394 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 280 tonnes
    Actual coal stock at the 90 MW UTRAULA TPS equivalent to 0 days of rolling stock, against the normative stock of 37,358 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 75,610 tonnes
    Actual coal stock at the 1,800 MW AKALTARA TPS equivalent to 3 days of rolling stock, against the normative stock of 612,645 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 175,410 tonnes
    Actual coal stock at the 600 MW BALCO TPS equivalent to 20 days of rolling stock, against the normative stock of 224,938 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 7,970 tonnes
    Actual coal stock at the 300 MW BANDAKHAR TPP equivalent to 2 days of rolling stock, against the normative stock of 112,918 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 227,970 tonnes
    Actual coal stock at the 1,200 MW BARADARHA TPS equivalent to 12 days of rolling stock, against the normative stock of 492,092 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 25,130 tonnes
    Actual coal stock at the 600 MW BINJKOTE TPP equivalent to 3 days of rolling stock, against the normative stock of 239,142 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 16,080 tonnes
    Actual coal stock at the 600 MW NAWAPARA TPP equivalent to 2 days of rolling stock, against the normative stock of 252,326 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 30,260 tonnes
    Actual coal stock at the 600 MW PATHADI TPP equivalent to 4 days of rolling stock, against the normative stock of 208,083 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 114,310 tonnes
    Actual coal stock at the 2,400 MW TAMNAR TPP equivalent to 3 days of rolling stock, against the normative stock of 1,065,527 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 153,310 tonnes
    Actual coal stock at the 1,440 MW UCHPINDA TPP equivalent to 7 days of rolling stock, against the normative stock of 571,484 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 21,560 tonnes
    Actual coal stock at the 362 MW SABARMATI (D-F STATIONS) equivalent to 5 days of rolling stock, against the normative stock of 110,064 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 266,000 tonnes
    Actual coal stock at the 1,200 MW ANUPPUR TPP equivalent to 17 days of rolling stock, against the normative stock of 414,124 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 35,160 tonnes
    Actual coal stock at the 500 MW BINA TPS equivalent to 5 days of rolling stock, against the normative stock of 196,271 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 21,660 tonnes
    Actual coal stock at the 600 MW SEIONI TPP equivalent to 3 days of rolling stock, against the normative stock of 203,519 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 70,920 tonnes
    Actual coal stock at the 1,350 MW AMRAVATI TPS equivalent to 4 days of rolling stock, against the normative stock of 444,970 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 59,730 tonnes
    Actual coal stock at the 600 MW BUTIBORI TPP equivalent to 7 days of rolling stock, against the normative stock of 213,221 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 4,790 tonnes
    Actual coal stock at the 500 MW DAHANU TPS equivalent to 1 days of rolling stock, against the normative stock of 164,459 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 55,280 tonnes
    Actual coal stock at the 600 MW DHARIWAL TPP equivalent to 7 days of rolling stock, against the normative stock of 214,381 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 7,000 tonnes
    Actual coal stock at the 12 MW DISHERGARH TPP equivalent to 43 days of rolling stock, against the normative stock of 4,264 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 46,880 tonnes
    Actual coal stock at the 600 MW GMR WARORA TPS equivalent to 6 days of rolling stock, against the normative stock of 212,545 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 192,940 tonnes
    Actual coal stock at the 3,300 MW TIRORA TPS equivalent to 4 days of rolling stock, against the normative stock of 1,154,419 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 135,770 tonnes
    Actual coal stock at the 540 MW WARDHA WARORA TPP equivalent to 19 days of rolling stock, against the normative stock of 189,238 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 61,160 tonnes
    Actual coal stock at the 1,320 MW PAINAMPURAM TPP equivalent to 4 days of rolling stock, against the normative stock of 410,413 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 19,240 tonnes
    Actual coal stock at the 1,320 MW SGPL TPP equivalent to 1 days of rolling stock, against the normative stock of 372,207 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 74,970 tonnes
    Actual coal stock at the 1,040 MW VIZAG TPP equivalent to 5 days of rolling stock, against the normative stock of 369,583 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 64,520 tonnes
    Actual coal stock at the 240 MW JOJOBERA TPS equivalent to 19 days of rolling stock, against the normative stock of 87,664 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 24,050 tonnes
    Actual coal stock at the 540 MW MAHADEV PRASAD STPP equivalent to 3 days of rolling stock, against the normative stock of 201,129 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 197,870 tonnes
    Actual coal stock at the 1,050 MW MAITHON RB TPP equivalent to 14 days of rolling stock, against the normative stock of 357,298 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 1,133,800 tonnes
    Actual coal stock at the 1,200 MW DERANG TPP equivalent to 66 days of rolling stock, against the normative stock of 445,979 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 49,400 tonnes
    Actual coal stock at the 1,050 MW KAMALANGA TPS equivalent to 3 days of rolling stock, against the normative stock of 402,556 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 83,070 tonnes
    Actual coal stock at the 600 MW VEDANTA TPP equivalent to 9 days of rolling stock, against the normative stock of 241,862 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 201,900 tonnes
    Actual coal stock at the 750 MW BUDGE BUDGE TPS equivalent to 23 days of rolling stock, against the normative stock of 231,945 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 53,230 tonnes
    Actual coal stock at the 600 MW HALDIA TPP equivalent to 7 days of rolling stock, against the normative stock of 212,616 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 68,340 tonnes
    Actual coal stock at the 300 MW HIRANMAYE TPP equivalent to 16 days of rolling stock, against the normative stock of 113,914 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 37,230 tonnes
    Actual coal stock at the 135 MW SOUTHERN REPL. TPS equivalent to 18 days of rolling stock, against the normative stock of 53,873 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 129,940 tonnes
    Actual coal stock at the 600 MW AVANTHA BHANDAR equivalent to 14 days of rolling stock, against the normative stock of 239,760 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 51,770 tonnes
    Actual coal stock at the 1,000 MW OP JINDAL TPS equivalent to 3 days of rolling stock, against the normative stock of 419,475 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 42,490 tonnes
    Actual coal stock at the 1,370 MW RAIKHEDA TPP equivalent to 2 days of rolling stock, against the normative stock of 506,474 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 28,610 tonnes
    Actual coal stock at the 1,200 MW MAHAN TPP equivalent to 2 days of rolling stock, against the normative stock of 425,905 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 183,340 tonnes
    Actual coal stock at the 1,320 MW NIGRI TPP equivalent to 12 days of rolling stock, against the normative stock of 410,047 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 132,120 tonnes
    Actual coal stock at the 3,960 MW SASAN UMTPP equivalent to 3 days of rolling stock, against the normative stock of 781,204 tonnes, equivalent to 17 days of normative stock required at the plant.
  • 19,920 tonnes
    Actual coal stock at the 500 MW SIKKA REP. TPS equivalent to 4 days of rolling stock, against the normative stock of 128,536 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 90,510 tonnes
    Actual coal stock at the 2,640 MW MUNDRA TPS-I & II equivalent to 4 days of rolling stock, against the normative stock of 541,899 tonnes, equivalent to 26 days of normative stock required at the plant.
  • tonnes
    Actual coal stock at the 1,980 MW MUNDRA TPS-III equivalent to 0 days of rolling stock, against the normative stock of 406,424 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 736,950 tonnes
    Actual coal stock at the 4,000 MW MUNDRA UMTPP equivalent to 23 days of rolling stock, against the normative stock of 847,954 tonnes, equivalent to 26 days of normative stock required at the plant.
  • tonnes
    Actual coal stock at the 1,200 MW SALAYA TPP equivalent to 0 days of rolling stock, against the normative stock of 318,240 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 13,920 tonnes
    Actual coal stock at the 300 MW JSW RATNAGIRI TPP equivalent to 5 days of rolling stock, against the normative stock of 71,604 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 103,460 tonnes
    Actual coal stock at the 750 MW TROMBAY TPS equivalent to 13 days of rolling stock, against the normative stock of 200,728 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 1,840 tonnes
    Actual coal stock at the 600 MW SIMHAPURI TPS equivalent to 0 days of rolling stock, against the normative stock of 159,120 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 980 tonnes
    Actual coal stock at the 300 MW THAMMINAPATNAM TPS equivalent to 0 days of rolling stock, against the normative stock of 114,851 tonnes, equivalent to 26 days of normative stock required at the plant.
  • tonnes
    Actual coal stock at the 260 MW TORANGALLU TPS(SBU-I) equivalent to 0 days of rolling stock, against the normative stock of 42,758 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 162,950 tonnes
    Actual coal stock at the 600 MW TORANGALLU TPS(SBU-II) equivalent to 30 days of rolling stock, against the normative stock of 141,435 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 18,230 tonnes
    Actual coal stock at the 1,200 MW UDUPI TPP equivalent to 2 days of rolling stock, against the normative stock of 271,518 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 60,920 tonnes
    Actual coal stock at the 1,200 MW ITPCL TPP equivalent to 5 days of rolling stock, against the normative stock of 331,182 tonnes, equivalent to 26 days of normative stock required at the plant.
  • 22,820 tonnes
    Actual coal stock at the 1,200 MW MUTHIARA TPP equivalent to 1 days of rolling stock, against the normative stock of 403,242 tonnes, equivalent to 26 days of normative stock required at the plant.
  • tonnes
    Actual coal stock at the 525 MW TUTICORIN TPP ST-IV equivalent to 0 days of rolling stock, against the normative stock of 180,999 tonnes, equivalent to 26 days of normative stock required at the plant.